TheStocktonMill
Final Billing Architectural Woodwork Suite – Export Order: Bahamas Project
Final Billing Architectural Woodwork Suite – Export Order: Bahamas Project
Couldn't load pickup availability
Prepared For: Karen King Interiors
Target Delivery Date: October 28–29, 2026 (Accelerated Schedule)
Delivery / Staging Point: Freight Container Terminal Facility in Wilmington, NC
Scope of Work
-
High-Capacity Quad Bunk Suite – Premium Baltic/birch plywood cabinet-grade fabrication with high-durability finish.
-
High-End Half Nautilus Singular Bunk Suite – Premium Baltic/birch plywood cabinet-grade fabrication with high-durability finish.
-
Pre-Fit & Installation Video Guide – Systems fully pre-fitted in-shop prior to crating, complete with a step-by-step walkthrough video for local assembly.
Project Financial Summary
-
Package Subtotal: $22,936.00
-
5% Client Discount: -$1,146.80
-
Total Base Project Investment: $21,789.20
Payments Received & Adjustments:
-
Initial Deposit (Paid via Venmo): -$3,000.00
-
Deposit Balance (Paid Sept 1, 2026): -$7,894.60
-
Accelerated Schedule Rush Fee (Container Loading Oct 28–29): +$1,000.00
Final Balance Due
-
Remaining Build Balance: $10,894.60
-
Accelerated Delivery Rush Fee: $1,000.00
-
TOTAL FINAL BALANCE DUE PRIOR TO DISPATCH: $11,894.60
Shop Terms & Final Delivery Notes
-
Delivery Responsibility: Stockton Mill provides secure transport and delivery directly to the designated freight container facility in Wilmington, NC for the advanced loading window of October 28–29, 2026. Container loading, ocean freight, and onward transit to the Bahamas remain managed by Karen King Interiors / client.
-
Final Settlement: Per shop terms, the final balance of $11,894.60 is due upon completion prior to shop release and transport to Wilmington, NC.
-
Design & Specifications: Built strictly according to Stockton Mill shop design standards. Written specifications and dimensions take precedence over conceptual sketches. Mattresses are not included.
Share
